PROJECTS

Installation and Dismantling of the Scaffolding
Pier 1, Pier 2, Pier 5, & Pier 6 for the Sabang Bridge (STAR Toll Project)

Work Scope:
  • Rebar Works
  • Access Scaffolding Installation
  • Access Scaffolding Dismantling
  • Formworks Installation
  • Concrete Pouring
  • Mobilization / Demobilization
  • Environment, Health & Safety
Client:
 


Supply & Installation of Scaffolding and the Installation of Circular Casing for Pier 2 – BP1; Pier 2A – BP1; Pier 3 – BP1; Pier 5A – BP1; 
(P2489 SLEX Bridge Widening Project)

Work Scope:
  • Rebar Works
  • Access Scaffolding Installation
  • Access Scaffolding Dismantling
  • Formworks Installation & Dismantling
  • Concrete Pouring
  • Making Good Concrete
  • Mobilization / Demobilization
  • Environment, Health & Safety
Client:
 

Installation & Dismantling of the Scaffolding of Bored Pile for the Sabang Bridge
(STAR Toll Project)

Work Scope:
  • Rebar Works
  • Access Scaffolding Installation
  • Access Scaffolding Dismantling
  • Formworks Installation
  • Concrete Pouring
  • Mobilization / Demobilization
  • Environment, Health & Safety
Client:
 

Scaffolding & Installation of Bored Pile Permanent Casing Works Project

Work Scope:
  • Rebar Works
  • Access Scaffolding Dismantling
  • Formworks Installation
  • Concrete Pouring
  • Mobilization / Demobilization
  • Environment, Health & Safety
Client:
 

North-South Commuter Railways: CP01 Viaduct Works - Construction of Drainage - Grade Drainage Mainline

Work Scope:
    • Excavation for Drainage Pipe/Channel in Mainline
    • Structural Concrete 28 mPa, Mainline Drainage Channel
    • Blinding Layer/Lean Concrete, 15mPa for Drainage Channel
    • Reinforcing Steel, Grade 40 & 60 for Drainage (Mainline)
    • RC Pipe Culverts, class C bedding in Mainline
    • Grouted Riprap, Class A
    • Manhole/Catch Basin
    • Placing and Compaction of Sand Bedding

Client:

Rectification of Ayala Nuvali Waterway Bridge (WB-27) Slope Protection

Work Scope:
  • Temporary Enclosure (Sand Bag Barriers)
  • Hauling (568 m³)
  • Manual Trimming Works
  • Removal of Actual Structures
  • Excavation
  • Grouted Riprap, Class A
  • Stone Masonry Wall
  • Apron
  • Reinforcing Steel (Anchor Block)
  • Structural Concrete (Anchor Block)




Client:
 

North - South Commuter Railways:
CP01 Viaduct Works -
Parapet Base Wall / End Wall

Work Scope:
  • Surveying of Lay-out points and positions
  • Assembly of Form Traveller
  • Installation of Rebar and Anchor U-Bolt
  • Fabricated Frame for Setting of U-Bolt
  • Formworks Installation for Base Columns
  • Casting of Base Columns
  • Formworks Installation for Mid Segments
  • Casting of Mid Segments
  • Dismantling of Formworks
  • Curing of Concrete




Client:
 

Pile Hacking 3,000 dia. at 1.0M and 0.5M Height with Equipment

Work Scope:
  • Site Preparation
  • Safety Measures
  • Provide and set up all required Equipment
  • Pile Hacking
  • Site Clean-Up




Client:
 

4-Storey Chruch Building Construction 

Work Scope:
  • Complete Building Construction
  • Ground Works
  • Civil Works
  • Electrical Works
  • Dike Improvement
  • Sewerage System
  • Plumbing Works
  • Fabrication
  • Concrete Works
  • Landscaping
  • Finishing Works



Client:
 

Single/Double Handhole & Service Box Installation

Work Scope:
  • Marking & Road Safety Warning Signs
  • Excavation of HH/SB
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Stabilized Backfill / Layer Compaction
  • Installation of Step Ladder
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • Perimeter Restoration
  • Manhole Frame & Cover



Client:
Fibernet Konstrukt Corp.
 

Single/Double Handhole & Service Box Installation

Work Scope:
  • Marking & Road Safety Warning Sign 
  • Excavation of HH/SB
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Stabilized Backfill / Layer Compaction
  • Installation of Step Ladder
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • Perimeter Restoration
  • Manhole Frame & Cover



Client:
CTD Asia Construction Corp.
 

 Riser Pole and Lateral Installation

Work Scope:
  • Pole Boring
  • GL Line
  • Base Pad Depth
  • Chamber Layer Installation
  • Excavation Pole Lateral
  • PVC Pipe Installation
  • Concrete Backfill
  • Laying of Caution Tape
  • Final Backfill
  • Check for Pole Lean




Client:
Fibernet Konstrukt Corp.
 

Asphalt and Concrete Restoration/Reblocking

Work Scope:
  • Concrete Breaking
  • Cylinder Sampling
  • Concrete Pouring
  • Concrete Restoration
  • Perimeter Restoration
  • Asphalting




Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Bridge Attachment of Microduct for Fiber Optic Cables

Work Scope:
  • Bracket Installation
  • Double Locking of Bolt & Nut
  • GI Pipe Installation
  • Vibration Coupling Installation
  • Wing Wall Installation




Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Riser Pole and Lateral Installation

Work Scope:
  • Marking & Road Safety Warning Sign
  • HH/SB and Trenching Excavation
  • Gravel Bedding/Concrete Pourin
  • Chamber Layer Installation
  • Concrete Pouring
  • Pole Boring
  • Excavation Pole Lateral
  • PVC Pipe Laying / Backfill
  • Check for Pole Lean




Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Type 1 and Type 2;
Open Trenching

Work Scope:
  • Trenching Excavation
  • Trenching Depth: Type1: 800MM Type2: 500MM
  • Compacting Bed / Applying Sand Bedding
  • Converge/MD Cable Laying
  • Sand Encasement
  • 100mm Concrete Protection
  • Warning Tape
  • Backfilling & Layer Compacting
  • Restoration & Site Clearing




Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Single/Double Handhole and Service Box Installation

Work Scope:
  • Marking & Road Safety Warning Signs
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Stabilized Backfill / Layer Compaction
  • Installation of Step Ladder
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • On Soil Levelling
  • Clearing / Housekeeping and Site Safety





Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Riser Pole and Lateral Installation

Work Scope:
  • Marking & Road Safety Warning Signs
  • HH/SB and Trenching Excavation
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • Pole Boring
  • Excavation Pole Lateral
  • PVC Pipe Laying / Backfill
  • Check for Pole Lean




Client:
 Linfra Corp. (Formerly DSCP Incorporated/ Sung II )
 

Entry/Exit Box Jointing

Work Scope:
  • Marking & Road Safety Warning Signs
  • Excavation of EE
  • Layer Compaction
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • Perform Overcuts
  • Clearing / Housekeeping and Site Safety




Client:
 Linfra Corp. (Formerly DSCP Incorporated/ Sung II )
 

Single/Double Handhole and Service Box Installation

Work Scope:
  • Marking & Road Safety Warning Signs
  • Excavation of HH/SB
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Stabilized Backfill / Layer Compaction
  • Installation of Step Ladder
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • Perform Overcuts
  • Clearing / Housekeeping and Site Safety





Client:
 Linfra Corp. (Formerly DSCP Incorporated)
 

Type 1 and Type 2;
Open Trenching

Work Scope:
  • Trenching Excavation
  • Trenching Depth: Type1: 800MM Type2: 500MM
  • Compacting Bed / Applying Sand Bedding
  • Converge/MD Cable Laying
  • Sand Encasement
  • 100mm Concrete Protection
  • Warning Tape
  • Backfilling & Layer Compacting
  • Restoration & Site Clearing





Client:
DS Fiber
 

Single/Double Handhole and Service Box Installation

Work Scope:
  • Marking & Road Safety Warning Signs
  • Excavation of HH/SB
  • Gravel Bedding/Concrete Pouring
  • Chamber Layer Installation
  • Stabilized Backfill / Layer Compaction
  • Installation of Step Ladder
  • Cylinder Sampling / Slump Test
  • Concrete Pouring
  • On Soil Levelling
  • Clearing / Housekeeping and Site Safety




Client:
Linfra Corp. Formerly (DSCP Incorporated)
 

Rehabilitation and Improvement of Parañaque River Mouth (South Side)

Work Scope:
  • Mobilization/Demobilization
  • Structure Excavation (Soft Soil)
  • Construction of Structure
  • Embankment
  • Structural Steel Sheet Piles, Driven
  • Laying of Armour Rock
  • Hauling and Disposal of Soils




Client:
AKN CONSTRUCTION CORPORATION
 

Removal of StockPiles at  P106 to P99-Excavation, Hauling & Spreading  Along Cavitex 

Work Scope:
  • Removal of Stockpiles at P106 to P99-Excavation
  • Hauling & Spreading along CAVITEX- From Pacific Drive Ave to PITX
  • Excavation, Removal of Stockpiles & Hauling at Pacific Drive Ave





Client:
LIGHT RAIL MANILA CORPORATION
 

Repair/ Rehabilitation/ Improvement of Drainage System Along West Service Road

Work Scope:
  • Improvement of Drainage System
  • Declogging of Drainage System along Service Road (Merville to Sucat)
  • Rectification and Replacement of Manhole Cover
  • Removal and Replacement of Damaged Sidewalk, Curb & Gutter, and Headwall
  • Cleaning and Desilting of Creek Tributary including Box Culverts Across East Service Road and its Vicinity (Including Hauling and Disposal)
  • Provision of Reinforced Concrete Lined Canal with Steel Grating
  •  Removal and Restoration of Structures Affected by Project Including Underground Utilities (Provisional Sum)




Client:
AKN CONSTRUCTION CORP.
 

Repair/ Rehabilitation of Pedestrian Overpass Along Ninoy Aquino Ave. 
(Multi-National Section)

Work Scope:
  • Assembling and disassembling steel pipe scaffolding
  • Cutting and removal of damaged portion
  • Welding and retrofitting
  • Concreting
  • Painting Works
  • Cleaning




Client:
Municipality of Parañaque